[에너지신문] 03 May 2016 - 29 generation projects with total installed capacity of 529 MW have been awarded during the power generation A-5 auction held on 29 April 2016 by the National Electric Energy Agency (ANEEL), including 158 MW of security capacity. All the projects are due to be commissioned in 2021. The average price of energy sold in the auction was R$198.6/MWh (around US$57/MWh) for a total investment of R$1.887bn (US$540m).

http://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/brazil-energy-regulator-awards-529-mw-projects-5-auction_36975.html

저작권자 © 에너지신문 무단전재 및 재배포 금지