[에너지신문] 09 May 2016 - Ghana expects the Offshore Cape Three Points (OCTP) integrated oil and gas project developed by Eni Ghana, the subsidiary of Italian energy group Eni in Ghana, in Sanzule in the Ellembelle District, to produce enough oil and gas to generate 1,000 MW over 20 years. Production is expected to reach 80,000 bbl/d.

Eni Ghana is the operator of the project, in partnership with Vitol Upstream Ghana and the Ghana National Petroleum Company (GNPC). The offshore field will be connected to Ghana mainland through 110 km of gas pipelines delivering gas to the Aboadze and Tema power enclaves.

-http://www.enerdata.net/enerdatauk/press-and-publication/energy-news-001/enis-octp-integrated-oil-gas-project-ghana-may-generate-1-gw_37043.html

저작권자 © 에너지신문 무단전재 및 재배포 금지